Americas +

Safety Mitigation Plan Design, Build & Installation Detailed action plan based on completed risk assessment and safety requirements specification.

  • The safety mitigation plan takes the results of the risk assessment and creates a detailed design plan to bring a machine into standards compliance.
  • This mitigation plan includes design of the safety related parts of the control system and guarding modification requirements as well as a validation plan.
  • A plan can include complete sub panel and guarding designs.
  • The fabrication of designs can also be facilitated to be provided as a turnkey solution.
  • Equipment modifications are typically performed by local integrators based on customer preference or recommendations can be provided.

Once a Risk Assessment is complete and the Safety Requirements Specification (SRS) are delivered and understood, the next step is the detailed mitigation design, build, and implementation.  This would include electrical panel schematics and panels, fluid power circuits, and guarding or modification to guarding designs.

These can also be built and delivered as a turnkey solution.  This is particularly helpful when a number of similar machines are being upgraded across a facility or corporation.  ROSS Control can provide a kitted design to provide uniformity and compliance from machine to machine and plant to plant.

Installation would typically involve local contractors that the end user is already familiar with or those recommended by ROSS.